ITAC Assessment: TT0238
ITAC logo
ITAC Assessment: TT0238
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Sand
NAICS 212322: Industrial Sand Mining
SIC 1446: Industrial Sand
Sales Range $50
M
to 100
M
# of Employees 31
Plant Area 100,000
ft2
Annual Production 500,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $902,650 17,750,934
kWh
Electricity Demand $689,050 56,452
kW-mo/yr
Natural Gas $345,016 89,615
MMBtu
Fuel Oil #2 $250,100 14,248
MMBtu
TOTAL YEARLY COSTS $2,186,816
RECOMMENDED SAVINGS* $87,829 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $67,316

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.1113: Reduce combustion air flow to optimum $28,385 $3,500 - - $28,385
-
MMBtu
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $19,091 $75,890 $9,674
190,434
kWh
$4,712
-
kW-mo/yr
- - $4,705
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,222 $25,000 $13,222
260,275
kWh
- - - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $10,965 $22,780 $10,965
215,850
kWh
- - - -
05 2.8226: Increase efficiency of trucks $7,291 $24,565 - - - $7,291
-
MMBtu
-
06 2.4323: Use optimum size and capacity equipment $6,836 $1,500 $6,836
134,567
kWh
- - - -
07 2.2136: Install / repair insulation on steam lines $1,527 $350 - - $1,527
-
MMBtu
- -
08 2.6218: Turn off equipment when not in use $511 $40 $511
10,066
kWh
- - - -
TOTAL RECOMMENDED $87,829 $153,625 $41,209
811,192
kWh
$4,712
-
kW-mo/yr
$29,912
-
MMBtu
$7,291
-
MMBtu
$4,705
TOTAL IMPLEMENTED $67,316 $104,060 $27,987
550,917
kWh
$4,712
-
kW-mo/yr
$29,912
-
MMBtu
- $4,705
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs