Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Other nonhazardous waste treatment and disposal
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MZ0322 #02 Y:2021 Install equipment (eg compactor) to reduce disposal costs $61,530 $226,000
MZ0322 #01 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $23,809 $9,182
MZ0304 #04 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $466 $250
MZ0304 #03 Y:2021 Change rate schedules or other changes in utility service $22,541 -
MZ0304 #02 Y:2021 Use solar heat to make electricty $16,323 $185,555
MZ0304 #01 Y:2021 Use existing dam to generate electricity $83,325 $120,377
UU0182 #06 Y:2021 Utilize controls to operate equipment only when needed $4,360 $920
UU0182 #05 Y:2021 Insulate bare equipment $5,611 $2,229
UU0182 #04 Y:2021 Add equipment/ operators to reduce production bottleneck $69,301 $172,000
UU0182 #03 Y:2021 Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $94,872 $621,000
UU0182 #02 Y:2021 Level two – install control system using iiot devices with communication capabilities to store data to the cloud $301,212 $427,040
UU0182 #01 Y:2021 Sell combustible waste $358,314 $840,585
BS0139 #03 Y:2020 Use solar heat to make electricty $3,565 $17,520
BS0139 #02 Y:2020 Install occupancy sensors $929 $200
BS0139 #01 Y:2020 Utilize higher efficiency lamps and/or ballasts $944 $2,630
CL2005 #03 Y:2019 Reduce fluid flow rates $16,601 $17,611
CL2005 #02 Y:2019 Use or replace with energy efficient substitutes $43,911 $200,000
CL2005 #01 Y:2019 Utilize higher efficiency lamps and/or ballasts $820 $4,518
BS0135 #03 Y:2019 Use most efficient type of electric motors $3,828 $21,800
BS0135 #02 Y:2019 Install occupancy sensors $698 $362