ITAC Assessment: UU0182
ITAC logo
ITAC Assessment: UU0182
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Renewable Natural Gas
NAICS 562219: Other Nonhazardous Waste Treatment and Disposal
SIC 4953: Refuse Systems
Sales Range $1
M
to 5
M
# of Employees 15
Plant Area 376,000
ft2
Annual Production 180,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $124,877 3,410,075
kWh
Electricity Demand $200,380 12,464
kW-mo/yr
Electricity Fees $14,342 -
Natural Gas $104,366 30,423
MMBtu
TOTAL YEARLY COSTS $443,965
RECOMMENDED SAVINGS* $833,670 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $663,886

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Primary Product Savings Increase in Production Savings
01 3.6125: Sell combustible waste $358,314 $840,585 $(-55,247.0)
(-1,508,667)
kWh
$(-33,225.8)
-
kW-mo/yr
$(-142,348.0)
-
MMBtu
- $589,135 -
02 4.663: Level two – install control system using iiot devices with communication capabilities to store data to the cloud $301,212 $427,040 - - - - - $301,212
03 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $94,872 $621,000 $96,237
2,628,000
kWh
$57,877
-
kW-mo/yr
$(-32,962.0)
-
MMBtu
$(-26,280.0) - -
04 4.111: Add equipment/ operators to reduce production bottleneck $69,301 $172,000 - - $(-42,652.0)
-
MMBtu
- - $111,953
05 2.2511: Insulate bare equipment $5,611 $2,229 - - $5,611
-
MMBtu
- - -
06 2.6231: Utilize controls to operate equipment only when needed $4,360 $920 $4,360
119,063
kWh
- - - - -
TOTAL RECOMMENDED $833,670 $2,063,774 $45,350
1,238,396
kWh
$24,651
-
kW-mo/yr
$(-212,351.0)
-
MMBtu
$(-26,280.0) $589,135 $413,165
TOTAL IMPLEMENTED $663,886 $1,268,545 $(-50,887.0)
(-1,389,604)
kWh
$(-33,225.8)
-
kW-mo/yr
$(-142,348.0)
-
MMBtu
- $589,135 $301,212
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Primary Product Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs