Assessment Year | 2021 |
---|---|
Principal Product | Renewable Natural Gas |
NAICS | 562219: Other Nonhazardous Waste Treatment and Disposal |
SIC | 4953: Refuse Systems |
Sales Range | $1 M to 5M |
# of Employees | 15 |
Plant Area |
376,000
ft2
|
Annual Production | 180,000
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $124,877 | 3,410,075 |
kWh
|
$0.037 |
Electricity Demand | $200,380 | 12,464 |
kW-mo/yr
|
$16.08 |
Electricity Fees | $14,342 | - |
|
- |
Natural Gas | $104,366 | 30,423 |
MMBtu
|
$3.43 |
TOTAL YEARLY COSTS | $443,965 | |||
RECOMMENDED SAVINGS* | $833,670 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $663,886 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Primary Product Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 3.6125: Sell combustible waste | $358,314 | $840,585 |
$(-55,247.0)
(-1,508,667)
kWh
|
$(-33,225.8)
-
kW-mo/yr
|
$(-142,348.0)
-
MMBtu
|
- | $589,135 | - | |
02 | 4.663: Level two – install control system using iiot devices with communication capabilities to store data to the cloud | $301,212 | $427,040 | - | - | - | - | - | $301,212 | |
03 | 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat | $94,872 | $621,000 |
$96,237
2,628,000
kWh
|
$57,877
-
kW-mo/yr
|
$(-32,962.0)
-
MMBtu
|
$(-26,280.0) | - | - | |
04 | 4.111: Add equipment/ operators to reduce production bottleneck | $69,301 | $172,000 | - | - |
$(-42,652.0)
-
MMBtu
|
- | - | $111,953 | |
05 | 2.2511: Insulate bare equipment | $5,611 | $2,229 | - | - |
$5,611
-
MMBtu
|
- | - | - | |
06 | 2.6231: Utilize controls to operate equipment only when needed | $4,360 | $920 |
$4,360
119,063
kWh
|
- | - | - | - | - | |
TOTAL RECOMMENDED | $833,670 | $2,063,774 |
$45,350
1,238,396
kWh
|
$24,651
-
kW-mo/yr
|
$(-212,351.0)
-
MMBtu
|
$(-26,280.0) | $589,135 | $413,165 | ||
TOTAL IMPLEMENTED | $663,886 | $1,268,545 |
$(-50,887.0)
(-1,389,604)
kWh
|
$(-33,225.8)
-
kW-mo/yr
|
$(-142,348.0)
-
MMBtu
|
- | $589,135 | $301,212 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Primary Product Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs