ITAC Assessment: AM0627
ITAC logo
ITAC Assessment: AM0627
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Milk
NAICS 311511: Fluid Milk Manufacturing
SIC 2026: Fluid Milk
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 55,000
ft2
Annual Production 30,000
Tgal
Production Hrs. Annual 7,440
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $323,386 7,881,144
kWh
Electricity Demand $114,380 16,324
kW-mo/yr
Electricity Fees $11,473 -
Natural Gas $80,996 19,824
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $80,838 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,546

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 3.3128: Utilize other methods to remove contaminants $66,393 $99,038 $(-2,024.0)
(-49,375)
kWh
- $68,417
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,546 $980 $7,546
184,045
kWh
$2,000
-
kW-mo/yr
-
03 2.4314: Use synthetic lubricant $2,906 - $2,171
52,948
kWh
$735
-
kW-mo/yr
-
04 2.7134: Use photocell controls $1,384 $520 $874
21,305
kWh
$510
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $609 $2,640 $609
14,846
kWh
- -
TOTAL RECOMMENDED $80,838 $103,178 $9,176
223,769
kWh
$3,245
-
kW-mo/yr
$68,417
TOTAL IMPLEMENTED $9,546 $980 $7,546
184,045
kWh
$2,000
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs