| Assessment Year | 2012 |
|---|---|
| Principal Product | Milk |
| NAICS | 311511: Fluid Milk Manufacturing |
| SIC | 2026: Fluid Milk |
| Sales Range | $10 M to 50M |
| # of Employees | 150 |
| Plant Area |
55,000
ft2
|
| Annual Production | 30,000
Tgal
|
| Production Hrs. Annual | 7,440
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $323,386 | 7,881,144 |
kWh
|
$0.041 |
| Electricity Demand | $114,380 | 16,324 |
kW-mo/yr
|
$7.01 |
| Electricity Fees | $11,473 | - |
|
- |
| Natural Gas | $80,996 | 19,824 |
MMBtu
|
$4.09 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $80,838 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $9,546 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 3.3128: Utilize other methods to remove contaminants | $66,393 | $99,038 |
$(-2,024.0)
(-49,375)
kWh
|
- | $68,417 | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,546 | $980 |
$7,546
184,045
kWh
|
$2,000
-
kW-mo/yr
|
- | |
| 03 | 2.4314: Use synthetic lubricant | $2,906 | - |
$2,171
52,948
kWh
|
$735
-
kW-mo/yr
|
- | |
| 04 | 2.7134: Use photocell controls | $1,384 | $520 |
$874
21,305
kWh
|
$510
-
kW-mo/yr
|
- | |
| 05 | 2.7135: Install occupancy sensors | $609 | $2,640 |
$609
14,846
kWh
|
- | - | |
| TOTAL RECOMMENDED | $80,838 | $103,178 |
$9,176
223,769
kWh
|
$3,245
-
kW-mo/yr
|
$68,417 | ||
| TOTAL IMPLEMENTED | $9,546 | $980 |
$7,546
184,045
kWh
|
$2,000
-
kW-mo/yr
|
- | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs