ITAC Assessment: NL0071
ITAC logo
ITAC Assessment: NL0071
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Beef
NAICS 311611: Animal (except Poultry) Slaughtering
SIC 2011: Meat Packing Plants
Sales Range $100
M
to 500
M
# of Employees 380
Plant Area 116,030
ft2
Annual Production 187,714
units
Production Hrs. Annual 3,650
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $519,692 10,027,732
kWh
Electricity Demand $153,816 20,013
kW-mo/yr
Natural Gas $605,540 108,425
MMBtu
Fuel Oil #2 $19,283 860
MMBtu
Waste Disposal Costs
Water Usage $289,071 158,740
Tgal
Water Disposal $1,091,074 158,740
Tgal
TOTAL YEARLY COSTS $2,678,476
RECOMMENDED SAVINGS* $417,074 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $133,088

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.1224: Replace boiler $280,847 $220,000 $(-136,643.0)
(-2,643,000)
kWh
$(-51,650.0)
-
kW-mo/yr
$469,140
-
MMBtu
- - - -
02 3.4151: Minimize water usage $106,955 $72,150 - - $41,854
-
MMBtu
$13,636
-
Tgal
$51,465
-
Tgal
- -
03 2.4239: Eliminate or reduce compressed air usage $21,879 $30,410 $22,911
443,153
kWh
$(-1,032.0)
-
kW-mo/yr
- - - - -
04 2.2437: Recover waste heat from equipment $3,139 $8,000 - - $3,139
-
MMBtu
- - - -
05 2.2511: Insulate bare equipment $2,400 $9,724 - - $2,400
-
MMBtu
- - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,447 $4,500 $2,267
43,852
kWh
- - - - $(-720.0) $(-100.0)
07 2.2511: Insulate bare equipment $407 $2,521 - - $407
-
MMBtu
- - - -
TOTAL RECOMMENDED $417,074 $347,305 $(-111,465.0)
(-2,155,995)
kWh
$(-52,682.0)
-
kW-mo/yr
$516,940
-
MMBtu
$13,636
-
Tgal
$51,465
-
Tgal
$(-720.0) $(-100.0)
TOTAL IMPLEMENTED $133,088 $119,305 $25,178
487,005
kWh
$(-1,032.0)
-
kW-mo/yr
$44,661
-
MMBtu
$13,636
-
Tgal
$51,465
-
Tgal
$(-720.0) $(-100.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs