ITAC Assessment: AR0142
ITAC logo
ITAC Assessment: AR0142
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Carpet Padding
NAICS
n/a
SIC 3086: Plastics Foam Products
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 60,000
ft2
Annual Production 561,000
pieces
Production Hrs. Annual 5,049
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $67,096 2,250,586
kWh
Electricity Demand $45,904 8,315
kW-mo/yr
Natural Gas $55,701 12,530
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $105,274 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,678

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.4133: Use most efficient type of electric motors $311 $655 $214
7,034
kWh
$97
-
kW-mo/yr
- - - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $866 - $603
20,223
kWh
$263
-
kW-mo/yr
- - - -
03 2.4221: Install compressor air intakes in coolest locations $272 $186 $167
5,569
kWh
$105
-
kW-mo/yr
- - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,472 $50 $1,024
34,291
kWh
$448
-
kW-mo/yr
- - - -
05 2.2136: Install / repair insulation on steam lines $757 $652 - - $757
-
MMBtu
- - -
06 3.5315: Lease / purchase baler; sell cardboard to recycler $3,263 $8,000 $(-17.0)
(-586)
kWh
$(-40.0)
-
kW-mo/yr
- - $3,788
-
lb
$(-468.0)
07 3.4116: Meter recycled water (to reduce sewer charges) $374 $210 - - - $374
-
Tgal
- -
08 4.445: Install equipment to move product $97,959 $21,200 $(-318.0)
(-10,551)
kWh
$(-179.0)
-
kW-mo/yr
- - - $98,456
TOTAL RECOMMENDED $105,274 $30,953 $1,673
55,980
kWh
$694
-
kW-mo/yr
$757
-
MMBtu
$374
-
Tgal
$3,788
-
lb
$97,988
TOTAL IMPLEMENTED $3,678 $1,543 $2,008
67,117
kWh
$913
-
kW-mo/yr
$757
-
MMBtu
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs