ITAC Assessment: BS0135
ITAC logo
ITAC Assessment: BS0135
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Wastewater Treatment
NAICS 562219: Other Nonhazardous Waste Treatment and Disposal
SIC 4952: Sewerage Systems
Sales Range $5
M
to 10
M
# of Employees 15
Plant Area 397,994
ft2
Annual Production 575,000
Tgal
Production Hrs. Annual 2,736
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $156,607 2,489,109
kWh
Electricity Demand $21,150 4,508
kW-mo/yr
Natural Gas $1,667 312
MMBtu
LPG $7,540 2,517
MMBtu
TOTAL YEARLY COSTS $186,964
RECOMMENDED SAVINGS* $4,675 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $148 $400 $110
1,839
kWh
$38
-
kW-mo/yr
02 2.7135: Install occupancy sensors $698 $362 $698
11,640
kWh
-
03 2.4133: Use most efficient type of electric motors $3,828 $21,800 $3,470
55,090
kWh
$358
-
kW-mo/yr
TOTAL RECOMMENDED $4,675 $22,562 $4,279
68,569
kWh
$396
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs