Assessment Year | 2005 |
---|---|
Principal Product | Class "C" motorhomes and commercial units |
NAICS | 336211: Motor Vehicle Body Manufacturing |
SIC | 3716: Motor Homes |
Sales Range | $10 M to 50M |
# of Employees | 105 |
Plant Area |
93,000
ft2
|
Annual Production | 250
ton
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $43,541 | 780,660 |
kWh
|
$0.056 |
Electricity Fees | $2,189 | - |
|
- |
Natural Gas | $59,999 | 7,508 |
MMBtu
|
$7.99 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $64,512 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $32,937 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $443 | $52 |
$443
8,397
kWh
|
- | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $758 | $200 |
$758
14,289
kWh
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $487 | $1,080 |
$487
9,239
kWh
|
- | - | - | |
04 | 2.2531: Re-size charging openings or add movable cover or door | $9,149 | - | - |
$9,149
-
MMBtu
|
- | - | |
05 | 4.623: Employ modular jigs to reduce process set-up time | $20,800 | $1,046 | - | - | $20,800 | - | |
06 | 4.652: Replace existing equipment with more suitable substitutes | $650 | $1,840 | - | - | $650 | - | |
07 | 4.652: Replace existing equipment with more suitable substitutes | $650 | $1,270 | - | - | $650 | - | |
08 | 4.111: Add equipment/ operators to reduce production bottleneck | $11,267 | $14,500 | - | - | $11,267 | - | |
09 | 4.448: Install automatic part storage / retreval system | $8,580 | $14,000 | - | - | $8,580 | - | |
10 | 4.652: Replace existing equipment with more suitable substitutes | $2,781 | $500 | - | - | $2,781 | - | |
11 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $1,202 | $1,640 | - | - | - | $1,202 | |
12 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $7,745 | $28,000 | - | - | - | $7,745 | |
TOTAL RECOMMENDED | $64,512 | $64,128 |
$1,688
31,925
kWh
|
$9,149
-
MMBtu
|
$44,728 | $8,947 | ||
TOTAL IMPLEMENTED | $32,937 | $5,488 |
$1,688
31,925
kWh
|
$9,149
-
MMBtu
|
$22,100 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs