| Assessment Year | 2005 |
|---|---|
| Principal Product | Class "C" motorhomes and commercial units |
| NAICS | 336211: Motor Vehicle Body Manufacturing |
| SIC | 3716: Motor Homes |
| Sales Range | $10 M to 50M |
| # of Employees | 105 |
| Plant Area |
93,000
ft2
|
| Annual Production | 250
ton
|
| Production Hrs. Annual | 2,210
hrs
|
| Location (State) | Iowa |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $43,541 | 780,660 |
kWh
|
$0.056 |
| Electricity Fees | $2,189 | - |
|
- |
| Natural Gas | $59,999 | 7,508 |
MMBtu
|
$7.99 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $64,512 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $32,937 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $443 | $52 |
$443
8,397
kWh
|
- | - | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $758 | $200 |
$758
14,289
kWh
|
- | - | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $487 | $1,080 |
$487
9,239
kWh
|
- | - | - | |
| 04 | 2.2531: Re-size charging openings or add movable cover or door | $9,149 | - | - |
$9,149
-
MMBtu
|
- | - | |
| 05 | 4.623: Employ modular jigs to reduce process set-up time | $20,800 | $1,046 | - | - | $20,800 | - | |
| 06 | 4.652: Replace existing equipment with more suitable substitutes | $650 | $1,840 | - | - | $650 | - | |
| 07 | 4.652: Replace existing equipment with more suitable substitutes | $650 | $1,270 | - | - | $650 | - | |
| 08 | 4.111: Add equipment/ operators to reduce production bottleneck | $11,267 | $14,500 | - | - | $11,267 | - | |
| 09 | 4.448: Install automatic part storage / retreval system | $8,580 | $14,000 | - | - | $8,580 | - | |
| 10 | 4.652: Replace existing equipment with more suitable substitutes | $2,781 | $500 | - | - | $2,781 | - | |
| 11 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $1,202 | $1,640 | - | - | - | $1,202 | |
| 12 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $7,745 | $28,000 | - | - | - | $7,745 | |
| TOTAL RECOMMENDED | $64,512 | $64,128 |
$1,688
31,925
kWh
|
$9,149
-
MMBtu
|
$44,728 | $8,947 | ||
| TOTAL IMPLEMENTED | $32,937 | $5,488 |
$1,688
31,925
kWh
|
$9,149
-
MMBtu
|
$22,100 | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs