ITAC Assessment: UC2511
ITAC logo
ITAC Assessment: UC2511
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Engineered Fasteners
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3492: Fluid Power Valves and Hose Fittings
Sales Range $100
M
to 500
M
# of Employees 316
Plant Area 49,533
ft2
Annual Production 8,289
units
Production Hrs. Annual 6,000
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $363,530 3,052,800
kWh
Electricity Demand $151,561 7,375
kW-mo/yr
Natural Gas $453,511 32,342
MMBtu
Waste Disposal Costs
Water Usage $8,823 1,177
Tgal
TOTAL YEARLY COSTS $977,424
RECOMMENDED SAVINGS* $397,898 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,109 $1,474 $6,950
58,355
kWh
$159
-
kW-mo/yr
- -
02 2.4221: Install compressor air intakes in coolest locations $2,290 $2,200 $1,904
15,985
kWh
$386
-
kW-mo/yr
- -
03 2.7135: Install occupancy sensors $6,520 $10,625 $6,316
52,716
kWh
$205
-
kW-mo/yr
- -
04 2.7134: Use photocell controls $6,789 $14,000 $6,621
55,265
kWh
$168
-
kW-mo/yr
- -
05 2.2437: Recover waste heat from equipment $22,999 $8,485 - - $22,999
-
MMBtu
-
06 2.2511: Insulate bare equipment $3,267 $2,180 - - $3,267
-
MMBtu
-
07 2.9114: Use solar heat to make electricty $225,469 $2,423,010 $225,469
1,893,107
kWh
- - -
08 2.6231: Utilize controls to operate equipment only when needed $6,726 $75 $6,726
56,469
kWh
- - -
09 2.1321: Replace fossil fuel equipment with electrical equipment $116,730 $360,000 $(-43,559.7)
(-365,740)
kWh
- $152,348
-
MMBtu
$7,941
-
Tgal
TOTAL RECOMMENDED $397,898 $2,822,049 $210,425
1,766,157
kWh
$918
-
kW-mo/yr
$178,615
-
MMBtu
$7,941
-
Tgal
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs