ITAC Assessment: SD0611
ITAC logo
ITAC Assessment: SD0611
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Surfactants, Detergents
NAICS 325611: Soap and Other Detergent Manufacturing
SIC 2841: Soap and Other Detergents, Except Specialty Cleaners
Sales Range $10
M
to 50
M
# of Employees 32
Plant Area 47,100
ft2
Annual Production 133,350,000
lb
Production Hrs. Annual 8,050
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $623,409 6,128,762
kWh
Electricity Demand $191,283 10,870
kW-mo/yr
Electricity Fees $66,077 -
Natural Gas $136,825 38,096
MMBtu
TOTAL YEARLY COSTS $1,017,594
RECOMMENDED SAVINGS* $91,383 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $78,426

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.7425: Clean or color roof to reduce solar load $30,193 $22,050 $21,199
208,442
kWh
$8,994
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $5,709 $10,350 $4,536
44,610
kWh
$1,173
-
kW-mo/yr
- -
03 2.7232: Replace existing hvac unit with high efficiency model $5,824 $24,300 $4,197
41,258
kWh
$1,627
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,424 $1,815 $1,046
10,288
kWh
$361
-
kW-mo/yr
- $17
05 2.7135: Install occupancy sensors $203 $387 $203
1,997
kWh
- - -
06 2.1223: Install smaller boiler (increase high fire duty cycle) $45,722 $186,400 - - $45,722
-
MMBtu
-
07 2.2441: Preheat boiler makeup water with waste process heat $2,308 $6,000 - - $2,308
-
MMBtu
-
TOTAL RECOMMENDED $91,383 $251,302 $31,181
306,595
kWh
$12,155
-
kW-mo/yr
$48,030
-
MMBtu
$17
TOTAL IMPLEMENTED $78,426 $214,837 $21,402
210,439
kWh
$8,994
-
kW-mo/yr
$48,030
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs