| Assessment Year | 1994 |
|---|---|
| Principal Product | Newspapers |
| NAICS |
n/a
|
| SIC | 2711: Newspapers: Publishing, or Publishing and Printing |
| Sales Range | $10 M to 50M |
| # of Employees | 400 |
| Plant Area |
93,600
ft2
|
| Annual Production | 28,000,000
pieces
|
| Production Hrs. Annual | 6,396
hrs
|
| Location (State) | Nevada |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $242,217 | 3,774,619 |
kWh
|
$0.064 |
| Natural Gas | $52,060 | 10,581 |
MMBtu
|
$4.92 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $14,722 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $7,281 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $4,995 | $3,498 |
$4,995
77,960
kWh
|
- | |
| 02 | 2.3212: Optimize plant power factor | $1,726 | $6,150 |
$1,726
-
kWh
|
- | |
| 03 | 2.7111: Reduce illumination to minimum necessary levels | $323 | - |
$323
4,689
kWh
|
- | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $734 | $120 |
$734
11,430
kWh
|
- | |
| 05 | 2.7134: Use photocell controls | $170 | - |
$170
2,638
kWh
|
- | |
| 06 | 2.7135: Install occupancy sensors | $1,632 | $341 |
$1,632
25,498
kWh
|
- | |
| 07 | 2.2511: Insulate bare equipment | $377 | $162 | - |
$377
-
MMBtu
|
|
| 08 | 2.4221: Install compressor air intakes in coolest locations | $3,213 | $250 |
$3,213
50,117
kWh
|
- | |
| 09 | 2.7243: Improve air circulation with destratification fans / other methods | $1,552 | $2,450 | - |
$1,552
-
MMBtu
|
|
| TOTAL RECOMMENDED | $14,722 | $12,971 |
$12,793
172,332
kWh
|
$1,929
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $7,281 | $6,068 |
$5,729
89,390
kWh
|
$1,552
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs