ITAC Assessment: NV0015
ITAC logo
ITAC Assessment: NV0015
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Newspapers
NAICS
n/a
SIC 2711: Newspapers: Publishing, or Publishing and Printing
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area 93,600
ft2
Annual Production 28,000,000
pieces
Production Hrs. Annual 6,396
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $242,217 3,774,619
kWh
Natural Gas $52,060 10,581
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,722 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,281

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $4,995 $3,498 $4,995
77,960
kWh
-
02 2.3212: Optimize plant power factor $1,726 $6,150 $1,726
-
kWh
-
03 2.7111: Reduce illumination to minimum necessary levels $323 - $323
4,689
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $734 $120 $734
11,430
kWh
-
05 2.7134: Use photocell controls $170 - $170
2,638
kWh
-
06 2.7135: Install occupancy sensors $1,632 $341 $1,632
25,498
kWh
-
07 2.2511: Insulate bare equipment $377 $162 - $377
-
MMBtu
08 2.4221: Install compressor air intakes in coolest locations $3,213 $250 $3,213
50,117
kWh
-
09 2.7243: Improve air circulation with destratification fans / other methods $1,552 $2,450 - $1,552
-
MMBtu
TOTAL RECOMMENDED $14,722 $12,971 $12,793
172,332
kWh
$1,929
-
MMBtu
TOTAL IMPLEMENTED $7,281 $6,068 $5,729
89,390
kWh
$1,552
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs