ITAC Assessment: MZ0322
ITAC logo
ITAC Assessment: MZ0322
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product domestic and industrial wastewater
NAICS 562219: Other Nonhazardous Waste Treatment and Disposal
SIC 4953: Refuse Systems
Sales Range less than $500
k
# of Employees 4
Plant Area 850,000
ft2
Annual Production 1,500,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $191,947 3,679,190
kWh
Electricity Demand $35,077 6,472
kW-mo/yr
TOTAL YEARLY COSTS $227,024
RECOMMENDED SAVINGS* $85,339 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings By-product Production Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $23,809 $9,182 $23,809
457,393
kWh
- -
02 3.6193: Install equipment (eg compactor) to reduce disposal costs $61,530 $226,000 $(-4,338.0)
(-83,432)
kWh
$(-732.0)
-
kW-mo/yr
$66,600
TOTAL RECOMMENDED $85,339 $235,182 $19,471
373,961
kWh
$(-732.0)
-
kW-mo/yr
$66,600
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs