| Assessment Year | 1991 |
|---|---|
| Principal Product | STEEL AEROSOL CANS |
| NAICS |
n/a
|
| SIC | 3411: Metal Cans |
| Sales Range | $50 M to 100M |
| # of Employees | 150 |
| Plant Area |
n/a
|
| Annual Production | 84,000,000
pieces
|
| Production Hrs. Annual | 7,488
hrs
|
| Location (State) | South Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $283,726 | 5,892,439 |
kWh
|
$0.048 |
| Natural Gas | $347,456 | 94,128 |
MMBtu
|
$3.69 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $28,253 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $28,253 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2414: Use waste heat from hot flue gases to preheat | $13,583 | $12,800 | - |
$13,583
-
MMBtu
|
|
| 02 | 2.2511: Insulate bare equipment | $5,413 | $1,020 | - |
$5,413
-
MMBtu
|
|
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,685 | - |
$4,685
97,597
kWh
|
- | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,954 | $210 |
$2,954
61,547
kWh
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,266 | $990 |
$1,266
26,671
kWh
|
- | |
| 06 | 2.7111: Reduce illumination to minimum necessary levels | $352 | - |
$352
7,327
kWh
|
- | |
| TOTAL RECOMMENDED | $28,253 | $15,020 |
$9,257
193,142
kWh
|
$18,996
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $28,253 | $15,020 |
$9,257
193,142
kWh
|
$18,996
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs