ITAC Assessment: UA0198
ITAC logo
ITAC Assessment: UA0198
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Wastewater Treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $1
M
to 5
M
# of Employees 6
Plant Area 522,720
ft2
Annual Production 1,095,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $257,939 2,443,800
kWh
Electricity Demand $20,069 4,234
kW-mo/yr
Electricity Fees $(-7,427.0) -
TOTAL YEARLY COSTS $270,581
RECOMMENDED SAVINGS* $38,128 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,001

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $26,573 $13,202 $24,982
236,684
kWh
$2,313
-
kW-mo/yr
$(-722.0)
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,127 $1,410 $2,005
18,992
kWh
$185
-
kW-mo/yr
$(-63.0)
03 2.7261: Install timers and/or thermostats $6,436 $50 $6,628
62,795
kWh
- $(-192.0)
04 2.7261: Install timers and/or thermostats $2,992 $180 $3,081
29,193
kWh
- $(-89.0)
TOTAL RECOMMENDED $38,128 $14,842 $36,696
347,664
kWh
$2,498
-
kW-mo/yr
$(-1,066.0)
TOTAL IMPLEMENTED $36,001 $13,432 $34,691
328,672
kWh
$2,313
-
kW-mo/yr
$(-1,003.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs