ITAC Assessment: CL2005
ITAC logo
ITAC Assessment: CL2005
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product clean Water
NAICS 562219: Other Nonhazardous Waste Treatment and Disposal
SIC 4952: Sewerage Systems
Sales Range $5
M
to 10
M
# of Employees 20
Plant Area 25,000
ft2
Annual Production 1,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $119,184 3,151,345
kWh
Electricity Demand $67,709 6,579
kW-mo/yr
Electricity Fees $14,014 -
Waste Disposal Costs
Water Usage $15,000 2,500
Tgal
Water Disposal $1 3
Tgal
TOTAL YEARLY COSTS $215,908
RECOMMENDED SAVINGS* $61,332 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $820

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $820 $4,518 $377
9,930
kWh
$443
-
kW-mo/yr
02 2.4322: Use or replace with energy efficient substitutes $43,911 $200,000 $32,026
842,800
kWh
$11,885
-
kW-mo/yr
03 2.5123: Reduce fluid flow rates $16,601 $17,611 $12,109
318,651
kWh
$4,492
-
kW-mo/yr
TOTAL RECOMMENDED $61,332 $222,129 $44,512
1,171,381
kWh
$16,820
-
kW-mo/yr
TOTAL IMPLEMENTED $820 $4,518 $377
9,930
kWh
$443
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs