ITAC Assessment: ME0109
ITAC logo
ITAC Assessment: ME0109
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Dairy Products
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 10,100
ft2
Annual Production 110,000,000
lb
Production Hrs. Annual 4,370
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $203,666 1,920,868
kWh
Fuel Oil #6 $37,254 9,698
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,473 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,548

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #4 Savings
01 2.3212: Optimize plant power factor $14,260 $2,500 $14,260
-
kWh
-
02 2.4133: Use most efficient type of electric motors $2,215 $4,300 $2,215
20,809
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,548 $4,674 $3,548
17,878
kWh
-
04 2.2437: Recover waste heat from equipment $5,450 $9,000 - $5,450
-
MMBtu
TOTAL RECOMMENDED $25,473 $20,474 $20,023
38,687
kWh
$5,450
-
MMBtu
TOTAL IMPLEMENTED $3,548 $4,674 $3,548
17,878
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs