ITAC Assessment: BS0139
ITAC logo
ITAC Assessment: BS0139
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Wastewater Treatment
NAICS 562219: Other Nonhazardous Waste Treatment and Disposal
SIC 4952: Sewerage Systems
Sales Range $1
M
to 5
M
# of Employees 5
Plant Area 270,381
ft2
Annual Production 365,243
Tgal
Production Hrs. Annual 2,210
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $122,686 1,550,004
kWh
Electricity Demand $12,669 2,864
kW-mo/yr
Natural Gas $9,600 14,522
MMBtu
TOTAL YEARLY COSTS $144,955
RECOMMENDED SAVINGS* $5,438 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,873

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $944 $2,630 $724
9,163
kWh
$220
-
kW-mo/yr
02 2.7135: Install occupancy sensors $929 $200 $929
11,755
kWh
-
03 2.9114: Use solar heat to make electricty $3,565 $17,520 $3,565
45,042
kWh
-
TOTAL RECOMMENDED $5,438 $20,350 $5,217
65,960
kWh
$220
-
kW-mo/yr
TOTAL IMPLEMENTED $1,873 $2,830 $1,652
20,918
kWh
$220
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs