Assessment Year | 2009 |
---|---|
Principal Product | Mayonnaise, Dressing, and Other Prepared Sauce Manufacturin |
NAICS | 311941: Mayonnaise, Dressing, and Other Prepared Sauce Manufacturing |
SIC | 2035: Pickled Fruits and Vegetables, Vegetable Sauces and Seasonings, and Salad Dressings |
Sales Range | less than $500 k |
# of Employees | 400 |
Plant Area |
680,000
ft2
|
Annual Production | 700,000,000
lb
|
Production Hrs. Annual | 3,250
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,390,034 | 16,641,007 |
kWh
|
$0.084 |
Electricity Demand | $532,051 | 33,909 |
kW-mo/yr
|
$15.69 |
Electricity Fees | $11,682 | - |
|
- |
Natural Gas | $265,670 | 32,915 |
MMBtu
|
$8.07 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $157,663 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $95,815 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7241: Install outside air damper / economizer on hvac unit | $17,800 | $10,000 |
$17,800
213,000
kWh
|
- | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $12,170 | $1,000 |
$8,938
107,000
kWh
|
$3,232
-
kW-mo/yr
|
- | |
03 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $7,840 | $10,000 | - | - |
$7,840
-
MMBtu
|
|
04 | 2.2121: Increase amount of condensate returned | $15,940 | $2,263 |
$15,940
328,250
kWh
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $49,905 | $161,162 |
$36,716
437,100
kWh
|
$13,189
-
kW-mo/yr
|
- | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $39,102 | $50,136 |
$39,102
465,505
kWh
|
- | - | |
07 | 2.7261: Install timers and/or thermostats | $14,906 | $500 |
$14,906
177,450
kWh
|
- | - | |
TOTAL RECOMMENDED | $157,663 | $235,061 |
$133,402
1,728,305
kWh
|
$16,421
-
kW-mo/yr
|
$7,840
-
MMBtu
|
||
TOTAL IMPLEMENTED | $95,815 | $174,425 |
$79,394
1,085,350
kWh
|
$16,421
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs