ITAC Assessment: SD0419
ITAC logo
ITAC Assessment: SD0419
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Mayonnaise, Dressing, and Other Prepared Sauce Manufacturin
NAICS 311941: Mayonnaise, Dressing, and Other Prepared Sauce Manufacturing
SIC 2035: Pickled Fruits and Vegetables, Vegetable Sauces and Seasonings, and Salad Dressings
Sales Range less than $500
k
# of Employees 400
Plant Area 680,000
ft2
Annual Production 700,000,000
lb
Production Hrs. Annual 3,250
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,390,034 16,641,007
kWh
Electricity Demand $532,051 33,909
kW-mo/yr
Electricity Fees $11,682 -
Natural Gas $265,670 32,915
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $157,663 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $95,815

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7241: Install outside air damper / economizer on hvac unit $17,800 $10,000 $17,800
213,000
kWh
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $12,170 $1,000 $8,938
107,000
kWh
$3,232
-
kW-mo/yr
-
03 2.1243: Use heat from boiler blowdown to preheat boiler feed water $7,840 $10,000 - - $7,840
-
MMBtu
04 2.2121: Increase amount of condensate returned $15,940 $2,263 $15,940
328,250
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $49,905 $161,162 $36,716
437,100
kWh
$13,189
-
kW-mo/yr
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $39,102 $50,136 $39,102
465,505
kWh
- -
07 2.7261: Install timers and/or thermostats $14,906 $500 $14,906
177,450
kWh
- -
TOTAL RECOMMENDED $157,663 $235,061 $133,402
1,728,305
kWh
$16,421
-
kW-mo/yr
$7,840
-
MMBtu
TOTAL IMPLEMENTED $95,815 $174,425 $79,394
1,085,350
kWh
$16,421
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs