Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

782

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Household and institutional furniture manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK1086 #01 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $3,012 $1,489
UU0213 #05 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $639 $1,950
UU0213 #04 Y:2022 Optimize plant power factor $1,190 $3,000
UU0213 #03 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $1,602 $1,773
UU0213 #02 Y:2022 Install occupancy sensors $5,181 $18,250
UU0213 #01 Y:2022 Use power during off-peak periods $7,487 $8,000
UU0212 #07 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $382 $1,370
UU0212 #06 Y:2022 Use hot process fluids to preheat incoming process fluids $425 $850
UU0212 #05 Y:2022 Use optimum thickness insulation $4,220 $4,402
UU0212 #04 Y:2022 Optimize plant power factor $4,400 $9,000
UU0212 #03 Y:2022 Utilize higher efficiency lamps and/or ballasts $8,326 $21,555
UU0212 #02 Y:2022 Replace boiler $11,580 $80,000
UU0212 #01 Y:2022 Reschedule plant operations or reduce load to avoid peaks $15,149 $8,500
NC0659 #04 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $502 $100
NC0659 #03 Y:2021 Reduce the pressure of compressed air to the minimum required $787 $100
NC0659 #02 Y:2021 Install occupancy sensors $267 $546
NC0659 #01 Y:2021 Utilize higher efficiency lamps and/or ballasts $8,329 $12,820
UF0559 #08 Y:2021 Eliminate old stock and modify inventory control $5,262 $7,180
UF0559 #07 Y:2021 Reduce the pressure of compressed air to the minimum required $602 -
UF0559 #06 Y:2021 Utilize higher efficiency lamps and/or ballasts $1,328 $5,468