ITAC Assessment: UU0213
ITAC logo
ITAC Assessment: UU0213
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Folding tables
NAICS 337127: Institutional Furniture Manufacturing
SIC 2531: Public Building and Related Furniture
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 100,000
ft2
Annual Production 130,000
units
Production Hrs. Annual 4,680
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $72,084 1,890,100
kWh
Electricity Demand $151,895 9,468
kW-mo/yr
Electricity Fees $30,748 -
Natural Gas $45,084 10,268
MMBtu
TOTAL YEARLY COSTS $299,811
RECOMMENDED SAVINGS* $16,099 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
01 2.3137: Use power during off-peak periods $7,487 $8,000 - - - $7,487
02 2.7135: Install occupancy sensors $5,181 $18,250 $2,711
71,398
kWh
$2,470
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,602 $1,773 $1,602
42,157
kWh
- - -
04 2.3212: Optimize plant power factor $1,190 $3,000 - - $1,190 -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $639 $1,950 $460
12,113
kWh
$179
-
kW-mo/yr
- -
TOTAL RECOMMENDED $16,099 $32,973 $4,773
125,668
kWh
$2,649
-
kW-mo/yr
$1,190 $7,487
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs