Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Upholstered furniture
NAICS 337121: Upholstered Household Furniture Manufacturing
SIC 2512: Wood Household Furniture, Upholstered
Sales Range $5
M
to 10
M
# of Employees 79
Plant Area 115,000
ft2
Annual Production 20,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,156 897,249
kWh
Electricity Demand $35,631 6,005
kW-mo/yr
Electricity Fees $(-4,797.0) -
LPG $6,406 593
MMBtu
Waste Disposal Costs
Water Usage $1 1
Tgal
TOTAL YEARLY COSTS $100,397
RECOMMENDED SAVINGS* $9,885 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,329 $12,820 $5,533
78,592
kWh
$2,796
-
kW-mo/yr
- -
02 2.7135: Install occupancy sensors $267 $546 $267
3,786
kWh
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $787 $100 $523
7,424
kWh
$264
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $502 $100 $600
8,520
kWh
$302
-
kW-mo/yr
$(-200.0) $(-200.0)
TOTAL RECOMMENDED $9,885 $13,566 $6,923
98,322
kWh
$3,362
-
kW-mo/yr
$(-200.0) $(-200.0)
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs