ITAC Assessment: UK1212
ITAC logo
ITAC Assessment: UK1212
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Automotive Products
NAICS 332119: Metal Crown, Closure, and Other Metal Stamping (except Automotive)
SIC 3465: Automotive Stampings
Sales Range $10
M
to 50
M
# of Employees 114
Plant Area 80,000
ft2
Annual Production 28,400,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $130,577 3,387,208
kWh
Electricity Demand $99,183 8,336
kW-mo/yr
Electricity Fees $41,586 -
Natural Gas $6,633 833
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $77,654 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,472

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4239: Eliminate or reduce compressed air usage $15,105 $14,500 $8,524
221,115
kWh
$6,581
-
kW-mo/yr
- - -
02 2.4224: Upgrade controls on compressors $14,492 $15,000 $7,816
202,748
kWh
$6,676
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $11,414 $26,320 $7,059
183,120
kWh
$4,355
-
kW-mo/yr
- - -
04 2.1233: Analyze flue gas for proper air/fuel ratio $5,314 $2,240 $2,791
72,395
kWh
$2,523
-
kW-mo/yr
- - -
05 2.6124: Establish equipment maintenance schedule $4,209 $3,430 $2,495
64,720
kWh
$1,714
-
kW-mo/yr
- - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,607 $400 $917
23,777
kWh
$690
-
kW-mo/yr
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,205 $4,270 $455
11,815
kWh
$750
-
kW-mo/yr
- - -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $609 $990 $316
8,199
kWh
$293
-
kW-mo/yr
- - -
09 2.8114: Change rate schedules or other changes in utility service $17,314 - - - - $17,314 -
10 2.3212: Optimize plant power factor $4,850 $7,500 - - $4,850 - -
11 2.8123: Pay utility bills on time $1,535 - - - - - $1,535
TOTAL RECOMMENDED $77,654 $74,650 $30,373
787,889
kWh
$23,582
-
kW-mo/yr
$4,850 $17,314 $1,535
TOTAL IMPLEMENTED $22,472 $31,990 $12,345
320,235
kWh
$8,592
-
kW-mo/yr
- - $1,535
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs