Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Industrial Lifts
NAICS 333921: Elevator and Moving Stairway Manufacturing
SIC 3534: Elevators and Moving Stairways
Sales Range $1
M
to 5
M
# of Employees 38
Plant Area 74,000
ft2
Annual Production 750
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $26,477 555,641
kWh
Electricity Demand $21,522 2,759
kW-mo/yr
Electricity Fees $6,688 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $238,905 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $222,355

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 2.6218: Turn off equipment when not in use $1,447 $800 $2,747
57,562
kWh
$(-1,300.0) - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $(-2,108.0) $550 $804
17,515
kWh
$(-2,912.0) - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,341 $228 $1,341
28,140
kWh
- - -
04 4.123: Reduce defects by reducing product tipping $221,675 - - $(-1,750.0) $(-8,775.0) $232,200
05 3.2123: Convert to high volume low pressure (hvlp) paint guns $16,550 $2,176 - - $16,550 -
TOTAL RECOMMENDED $238,905 $3,754 $4,892
103,217
kWh
$(-5,962.0) $7,775 $232,200
TOTAL IMPLEMENTED $222,355 $1,578 $4,892
103,217
kWh
$(-5,962.0) $(-8,775.0) $232,200
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs