ITAC Assessment: OK0627
ITAC logo
ITAC Assessment: OK0627
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Blow Molding Products
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 67,190
ft2
Annual Production 28,500,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $735,045 15,061,032
kWh
Electricity Demand $58,292 -
Electricity Fees $3,110 -
Natural Gas $7,040 748
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,578 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,466

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.4221: Install compressor air intakes in coolest locations $2,445 $200 $2,304
46,080
kWh
$141
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $9,466 $9,056 $10,074
201,480
kWh
$619
-
kW-mo/yr
- $(-1,227.0)
03 2.6232: Install set-back timers $4,270 $1,050 - - $4,270
-
MMBtu
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $18,203 $7,500 $17,154
343,085
kWh
$1,049
-
kW-mo/yr
- -
05 2.7135: Install occupancy sensors $1,194 $1,680 $1,194
23,870
kWh
- - -
TOTAL RECOMMENDED $35,578 $19,486 $30,726
614,515
kWh
$1,809
-
kW-mo/yr
$4,270
-
MMBtu
$(-1,227.0)
TOTAL IMPLEMENTED $9,466 $9,056 $10,074
201,480
kWh
$619
-
kW-mo/yr
- $(-1,227.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs