ITAC Assessment: UU0166
ITAC logo
ITAC Assessment: UU0166
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Printed materials
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2752: Commercial Printing, Lithographic
Sales Range $100
M
to 500
M
# of Employees 430
Plant Area 525,000
ft2
Annual Production 40,000,000
units
Production Hrs. Annual 5,928
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $388,778 11,592,000
kWh
Electricity Demand $407,358 29,960
kW-mo/yr
Electricity Fees $67,597 -
Natural Gas $74,830 15,606
MMBtu
Waste Disposal Costs
Water Usage $42,408 6,633
Tgal
TOTAL YEARLY COSTS $980,971
RECOMMENDED SAVINGS* $44,421 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,516

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings
01 4.463: Modify facility to avoid excess maintenance costs $18,960 $212,180 - - - $18,960
-
Tgal
02 2.7142: Utilize higher efficiency lamps and/or ballasts $14,704 $52,483 $7,068
207,871
kWh
$7,636
-
kW-mo/yr
- -
03 2.2614: Use cooling tower or economizer to replace chiller cooling $5,545 $1,200 $5,545
163,080
kWh
- - -
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,448 $1,660 - $2,448
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,409 $600 $1,360
40,000
kWh
$49
-
kW-mo/yr
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $912 $100 $912
26,810
kWh
- - -
07 2.7291: Reschedule and rearrange multiple-source heating systems $443 $300 $146
4,285
kWh
- $297
-
MMBtu
-
TOTAL RECOMMENDED $44,421 $268,523 $15,031
442,046
kWh
$10,133
-
kW-mo/yr
$297
-
MMBtu
$18,960
-
Tgal
TOTAL IMPLEMENTED $35,516 $265,563 $8,574
252,156
kWh
$7,685
-
kW-mo/yr
$297
-
MMBtu
$18,960
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs