ITAC Assessment: UD0723
ITAC logo
ITAC Assessment: UD0723
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Fluid moving systems
NAICS 326220: Rubber and Plastics Hoses and Belting Manufacturing
SIC 3052: Rubber and Plastics Hose and Belting
Sales Range $50
M
to 100
M
# of Employees 450
Plant Area 110,000
ft2
Annual Production 26,000,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $211,034 7,580,083
kWh
Electricity Demand $163,830 16,920
kW-mo/yr
Natural Gas $193,777 26,401
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $79,856 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $58,929

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $24,840 $65,105 $12,580
503,320
kWh
$8,150
-
kW-mo/yr
- - $4,110
02 2.7111: Reduce illumination to minimum necessary levels $7,430 - $4,170
166,850
kWh
$3,260
-
kW-mo/yr
- - -
03 2.2414: Use waste heat from hot flue gases to preheat $7,394 - - - $7,394
-
MMBtu
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $6,315 $13,340 $3,350
133,848
kWh
$2,600
-
kW-mo/yr
- - $365
05 2.7241: Install outside air damper / economizer on hvac unit $6,126 $7,000 $6,126
122,515
kWh
- - - -
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,470 - - $5,470
-
kW-mo/yr
- - -
07 2.1131: Repair faulty insulation in furnaces, boilers, etc $4,573 - - - $4,573
-
MMBtu
- -
08 2.1233: Analyze flue gas for proper air/fuel ratio $4,309 - - - $4,309
-
MMBtu
- -
09 3.1222: Reduce water use with counter current rinsing $3,070 $2,000 $650
26,000
kWh
- - $2,420
-
gal
-
10 2.7233: Use properly designed and sized hvac equipment $2,730 - $1,660
66,200
kWh
$1,070
-
kW-mo/yr
- - -
11 2.2511: Insulate bare equipment $2,650 $2,629 - - $2,650
-
MMBtu
- -
12 2.4231: Reduce the pressure of compressed air to the minimum required $2,164 - $1,314
52,560
kWh
$850
-
kW-mo/yr
- - -
13 2.4131: Size electric motors for peak operating efficiency $1,423 $500 $864
34,560
kWh
$559
-
kW-mo/yr
- - -
14 2.4226: Use / purchase optimum sized compressor $840 - $840
33,600
kWh
- - - -
15 2.4224: Upgrade controls on compressors $522 - $522
20,880
kWh
- - - -
TOTAL RECOMMENDED $79,856 $90,574 $32,076
1,160,333
kWh
$21,959
-
kW-mo/yr
$18,926
-
MMBtu
$2,420
-
gal
$4,475
TOTAL IMPLEMENTED $58,929 $88,074 $28,062
999,973
kWh
$14,860
-
kW-mo/yr
$11,532
-
MMBtu
- $4,475
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs