ITAC Assessment: OK1086
ITAC logo
ITAC Assessment: OK1086
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Furniture for commercial & institutional applications
NAICS 337127: Institutional Furniture Manufacturing
SIC 2599: Furniture and Fixtures, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 100,000
ft2
Annual Production 10,000
pieces
Production Hrs. Annual 3,120
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $57,711 918,080
kWh
Electricity Demand $34,716 5,710
kW-mo/yr
Electricity Fees $951 -
Natural Gas $43,306 7,769
MMBtu
LPG $7,181 162
MMBtu
Waste Disposal Costs
Water Usage $4,070 814
Tgal
Water Disposal $5,181 803
Tgal
TOTAL YEARLY COSTS $153,116
RECOMMENDED SAVINGS* $44,062 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,642

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,012 $1,489 $3,012
47,803
kWh
- -
02 2.4221: Install compressor air intakes in coolest locations $630 $330 $531
8,428
kWh
$99
-
kW-mo/yr
-
03 2.7231: Use radiant heater for spot heating $8,472 $13,560 - - $8,472
-
MMBtu
04 2.9114: Use solar heat to make electricty $31,948 $382,200 $31,522
500,344
kWh
$426
-
kW-mo/yr
-
TOTAL RECOMMENDED $44,062 $397,579 $35,065
556,575
kWh
$525
-
kW-mo/yr
$8,472
-
MMBtu
TOTAL IMPLEMENTED $3,642 $1,819 $3,543
56,231
kWh
$99
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs