ITAC Assessment: SF0337
ITAC logo
ITAC Assessment: SF0337
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Drugs of Abuse Test Kits
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2835: In Vitro and In Vivo Diagnostic Substances
Sales Range $50
M
to 100
M
# of Employees 270
Plant Area 90,000
ft2
Annual Production 45,000,000
pieces
Production Hrs. Annual 2,340
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $210,970 2,208,699
kWh
Electricity Demand $90,154 6,546
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $69,006 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,759

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7224: Reduce space conditioning during non-working hours $9,667 - $9,667
86,009
kWh
- -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $50,318 $20,000 $10,884
96,818
kWh
$39,434
-
kW-mo/yr
-
03 2.2511: Insulate bare equipment $1,729 $937 - - $1,729
-
MMBtu
04 2.7135: Install occupancy sensors $3,650 $3,344 $1,990
16,990
kWh
$1,660
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,534 $3,510 $821
7,301
kWh
$713
-
kW-mo/yr
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,179 $3,376 $980
8,711
kWh
$199
-
kW-mo/yr
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $929 $3,460 $497
4,418
kWh
$432
-
kW-mo/yr
-
TOTAL RECOMMENDED $69,006 $34,627 $24,839
220,247
kWh
$42,438
-
kW-mo/yr
$1,729
-
MMBtu
TOTAL IMPLEMENTED $17,759 $11,167 $13,458
119,011
kWh
$2,572
-
kW-mo/yr
$1,729
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs