| Assessment Year | 2022 |
|---|---|
| Principal Product | Water Treatment |
| NAICS | 221310: Water Supply and Irrigation Systems |
| SIC | 4941: Water Supply |
| Sales Range | $1 M to 5M |
| # of Employees | 60 |
| Plant Area |
80,497
ft2
|
| Annual Production | 750,000
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $73,633 | 1,182,926 |
kWh
|
$0.062 |
| Electricity Demand | $7,405 | 2,635 |
kW-mo/yr
|
$2.81 |
| Electricity Fees | $273 | - |
|
- |
| LPG | $10,664 | 397 |
MMBtu
|
$26.86 |
| Fuel Oil #1 | $29,528 | 1,272 |
MMBtu
|
$23.21 |
| TOTAL YEARLY COSTS | $121,503 | |||
| RECOMMENDED SAVINGS* | $67,263 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $11,222 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Fuel Oil #1 Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.1321: Replace fossil fuel equipment with electrical equipment | $31,838 | $14,600 |
$(-4,635.0)
(-74,520)
kWh
|
$(-244.0)
-
kW-mo/yr
|
$9,585
-
MMBtu
|
$27,132
-
MMBtu
|
- | |
| 02 | 2.4322: Use or replace with energy efficient substitutes | $15,010 | $73,174 |
$15,010
241,321
kWh
|
- | - | - | - | |
| 03 | 2.4157: Establish a predictive maintenance program | $8,049 | $1,000 |
$8,851
142,295
kWh
|
$548
-
kW-mo/yr
|
- | - | $(-1,350.0) | |
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,819 | $15,170 |
$7,271
116,898
kWh
|
$548
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,802 | $3,626 |
$2,639
42,425
kWh
|
$163
-
kW-mo/yr
|
- | - | - | |
| 06 | 2.4224: Upgrade controls on compressors | $1,374 | $6,454 |
$1,293
20,784
kWh
|
$81
-
kW-mo/yr
|
- | - | - | |
| 07 | 2.4151: Develop a repair/replace policy | $371 | $1,608 |
$490
7,874
kWh
|
$31
-
kW-mo/yr
|
- | - | $(-150.0) | |
| TOTAL RECOMMENDED | $67,263 | $115,632 |
$30,919
497,077
kWh
|
$1,127
-
kW-mo/yr
|
$9,585
-
MMBtu
|
$27,132
-
MMBtu
|
$(-1,500.0) | ||
| TOTAL IMPLEMENTED | $11,222 | $6,234 |
$11,980
192,594
kWh
|
$742
-
kW-mo/yr
|
- | - | $(-1,500.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Fuel Oil #1 Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs