ITAC Assessment: WV0628
ITAC logo
ITAC Assessment: WV0628
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Water Treatment
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $1
M
to 5
M
# of Employees 60
Plant Area 80,497
ft2
Annual Production 750,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $73,633 1,182,926
kWh
Electricity Demand $7,405 2,635
kW-mo/yr
Electricity Fees $273 -
LPG $10,664 397
MMBtu
Fuel Oil #1 $29,528 1,272
MMBtu
TOTAL YEARLY COSTS $121,503
RECOMMENDED SAVINGS* $67,263 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,222

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #1 Savings Personnel Changes Savings
01 2.1321: Replace fossil fuel equipment with electrical equipment $31,838 $14,600 $(-4,635.0)
(-74,520)
kWh
$(-244.0)
-
kW-mo/yr
$9,585
-
MMBtu
$27,132
-
MMBtu
-
02 2.4322: Use or replace with energy efficient substitutes $15,010 $73,174 $15,010
241,321
kWh
- - - -
03 2.4157: Establish a predictive maintenance program $8,049 $1,000 $8,851
142,295
kWh
$548
-
kW-mo/yr
- - $(-1,350.0)
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,819 $15,170 $7,271
116,898
kWh
$548
-
kW-mo/yr
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,802 $3,626 $2,639
42,425
kWh
$163
-
kW-mo/yr
- - -
06 2.4224: Upgrade controls on compressors $1,374 $6,454 $1,293
20,784
kWh
$81
-
kW-mo/yr
- - -
07 2.4151: Develop a repair/replace policy $371 $1,608 $490
7,874
kWh
$31
-
kW-mo/yr
- - $(-150.0)
TOTAL RECOMMENDED $67,263 $115,632 $30,919
497,077
kWh
$1,127
-
kW-mo/yr
$9,585
-
MMBtu
$27,132
-
MMBtu
$(-1,500.0)
TOTAL IMPLEMENTED $11,222 $6,234 $11,980
192,594
kWh
$742
-
kW-mo/yr
- - $(-1,500.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #1 Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs