Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

433

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Motor vehicle body manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MS0433 #06 Y:2024 Replace fossil fuel equipment with electrical equipment $13,222 $50,000
MS0433 #05 Y:2024 Optimize plant power factor $8,443 $4,229
MS0433 #04 Y:2024 Use solar heat to make electricty $48,250 $482,125
MS0433 #03 Y:2024 Reduce the pressure of compressed air to the minimum required $5,497 -
MS0433 #02 Y:2024 Utilize higher efficiency lamps and/or ballasts $647 $1,821
MS0433 #01 Y:2024 Install occupancy sensors $750 $393
MZ0356 #09 Y:2023 Replace treated water with well / surface water $10,677 $100,000
MZ0356 #08 Y:2023 Meter recycled water (to reduce sewer charges) $7,202 $7,540
MZ0356 #07 Y:2023 Clean or color roof to reduce solar load $135,000 $306,035
MZ0356 #06 Y:2023 Use solar heat to make electricty $525,252 $3,450,533
MZ0356 #05 Y:2023 Lower temperature during the winter season and vice-versa $6,120 $2,680
MZ0356 #04 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $11,117 $14,802
MZ0356 #03 Y:2023 Recover waste heat from equipment $29,176 $63,400
MZ0356 #02 Y:2023 Eliminate or reduce compressed air usage $10,731 $440
MZ0356 #01 Y:2023 Install occupancy sensors $519 $415
CC0029 #07 Y:2023 Recover waste heat from equipment $38,352 $125,706
CC0029 #06 Y:2023 Use solar heat to make electricty $129,919 $1,308,548
CC0029 #05 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $74,488 $34,000
CC0029 #04 Y:2023 Minimize condenser cooling water temperature $12,405 $5,000
CC0029 #03 Y:2023 Maintain machines to reduce leaks $11,616 $5,629