ITAC Assessment: NL0126
ITAC logo
ITAC Assessment: NL0126
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Cranes and Truck Bodies
NAICS 336211: Motor Vehicle Body Manufacturing
SIC 3713: Truck and Bus Bodies
Sales Range $50
M
to 100
M
# of Employees 170
Plant Area 200,000
ft2
Annual Production 3,200
units
Production Hrs. Annual 2,040
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $338,705 5,848,953
kWh
Electricity Demand $61,684 13,276
kW-mo/yr
Electricity Fees $14,473 -
Natural Gas $100,983 22,631
MMBtu
Other Gas $69,065 1
MMBtu
Waste Disposal Costs
Water Usage $11,016 2,583
Tgal
Water Disposal $16,000 2,619
Tgal
Other Liquid (non-haz) $7,296 1
gal
TOTAL YEARLY COSTS $619,223
RECOMMENDED SAVINGS* $41,299 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Gas Savings Personnel Changes Savings Ancillary Material Cost Savings Increase in Production Savings
01 2.7243: Improve air circulation with destratification fans / other methods $28,492 $42,500 $1,626
28,030
kWh
$766
-
kW-mo/yr
- - - - $26,100
02 2.2514: Cover open tanks $5,486 $22,260 - - $5,486
-
MMBtu
- - - -
03 2.8121: Apply for tax-free status for energy purchases $3,213 $6,250 - - - $3,213
-
MMBtu
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,694 $200 $2,194
37,840
kWh
- - - $(-400.0) $(-100.0) -
05 3.5311: Recover and reuse waste material $1,264 $5,200 - - - - $590 $674 -
06 2.6218: Turn off equipment when not in use $1,150 $300 $1,150
19,832
kWh
- - - - - -
TOTAL RECOMMENDED $41,299 $76,710 $4,970
85,702
kWh
$766
-
kW-mo/yr
$5,486
-
MMBtu
$3,213
-
MMBtu
$190 $574 $26,100
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Gas Savings Personnel Changes Savings Ancillary Material Cost Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs