ITAC Assessment: MA0301
ITAC logo
ITAC Assessment: MA0301
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product paper
NAICS
n/a
SIC 2672: Coated and Laminated Paper, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 174,000
ft2
Annual Production 14,500
ton
Production Hrs. Annual 5,760
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,778,197 20,215,416
kWh
Fuel Oil #6 $832,233 324,358
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $522,079 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $498,484

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #6 Savings
01 2.5123: Reduce fluid flow rates $480,000 $657,000 - $480,000
-
MMBtu
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $16,698 $27,600 $16,698
189,918
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $14,256 $4,383 $14,256
162,075
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,228 - $4,228
48,066
kWh
-
05 2.2691: Shut off cooling if cold outside air will cool process $3,790 $1,236 $3,790
43,083
kWh
-
06 2.2692: Use outside cold water source as a supply of cooling water $1,830 $5,906 $1,830
20,809
kWh
-
07 2.4221: Install compressor air intakes in coolest locations $1,277 $2,540 $1,277
14,654
kWh
-
TOTAL RECOMMENDED $522,079 $698,665 $42,079
478,605
kWh
$480,000
-
MMBtu
TOTAL IMPLEMENTED $498,484 $661,383 $18,484
210,141
kWh
$480,000
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #6 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs