| Assessment Year | 1994 |
|---|---|
| Principal Product | paper |
| NAICS |
n/a
|
| SIC | 2672: Coated and Laminated Paper, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 140 |
| Plant Area |
174,000
ft2
|
| Annual Production | 14,500
ton
|
| Production Hrs. Annual | 5,760
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,778,197 | 20,215,416 |
kWh
|
$0.088 |
| Fuel Oil #6 | $832,233 | 324,358 |
MMBtu
|
$2.57 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $522,079 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $498,484 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #6 Savings |
|---|---|---|---|---|---|---|
| 01 | 2.5123: Reduce fluid flow rates | $480,000 | $657,000 | - |
$480,000
-
MMBtu
|
|
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $16,698 | $27,600 |
$16,698
189,918
kWh
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,256 | $4,383 |
$14,256
162,075
kWh
|
- | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,228 | - |
$4,228
48,066
kWh
|
- | |
| 05 | 2.2691: Shut off cooling if cold outside air will cool process | $3,790 | $1,236 |
$3,790
43,083
kWh
|
- | |
| 06 | 2.2692: Use outside cold water source as a supply of cooling water | $1,830 | $5,906 |
$1,830
20,809
kWh
|
- | |
| 07 | 2.4221: Install compressor air intakes in coolest locations | $1,277 | $2,540 |
$1,277
14,654
kWh
|
- | |
| TOTAL RECOMMENDED | $522,079 | $698,665 |
$42,079
478,605
kWh
|
$480,000
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $498,484 | $661,383 |
$18,484
210,141
kWh
|
$480,000
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #6 Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs