ITAC Assessment: HO0093
ITAC logo
ITAC Assessment: HO0093
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Preservatives for Personal Care Products
NAICS
n/a
SIC 2844: Perfumes, Cosmetics, and Other Toilet Preparations
Sales Range $10
M
to 50
M
# of Employees 35
Plant Area 35,000
ft2
Annual Production 3,500,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $100,297 945,780
kWh
Natural Gas $51,537 10,857
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,334 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $944 $1,279 $944
8,792
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $304 $999 $304
2,931
kWh
- -
03 2.4133: Use most efficient type of electric motors $557 $793 $557
5,275
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $531 $300 $531
4,982
kWh
- -
05 2.2136: Install / repair insulation on steam lines $267 $250 - $267
-
MMBtu
-
06 2.8113: Purchase gas directly from a contract gas supplier $7,731 $2,000 - - $7,731
TOTAL RECOMMENDED $10,334 $5,621 $2,336
21,980
kWh
$267
-
MMBtu
$7,731
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs