ITAC Assessment: OR0123
ITAC logo
ITAC Assessment: OR0123
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product WALL PANELING
NAICS
n/a
SIC 2435: Hardwood Veneer and Plywood
Sales Range $1
M
to 5
M
# of Employees 20
Plant Area
n/a
Annual Production 17
thousand feet
Production Hrs. Annual 2,000
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $22,073 430,246
kWh
Natural Gas $19,191 4,147
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,876 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,876

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,687 $4,200 $2,687
71,512
kWh
- -
02 2.3212: Optimize plant power factor $3,011 $4,800 $3,011
-
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,873 - $1,464
38,980
kWh
- $1,409
04 2.4133: Use most efficient type of electric motors $181 $691 $181
4,982
kWh
- -
05 2.1321: Replace fossil fuel equipment with electrical equipment $16,124 - $(-3,067.0)
(-57,737)
kWh
$19,191
-
MMBtu
-
TOTAL RECOMMENDED $24,876 $9,691 $4,276
57,737
kWh
$19,191
-
MMBtu
$1,409
TOTAL IMPLEMENTED $24,876 $9,691 $4,276
57,737
kWh
$19,191
-
MMBtu
$1,409
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs