ITAC Assessment: MS0279
ITAC logo
ITAC Assessment: MS0279
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Lumber
NAICS 321999: All Other Miscellaneous Wood Product Manufacturing
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 136
Plant Area 237,500
ft2
Annual Production 90,000
thousand feet
Production Hrs. Annual 2,500
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $586,915 16,286,795
kWh
Electricity Fees $246,448 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $74,708 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $64,260

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings
01 2.7124: Make a practice of turning off lights when not needed $34,961 $10,692 $21,617
932,292
kWh
$13,344
02 2.7142: Utilize higher efficiency lamps and/or ballasts $19,855 $37,579 $13,723
454,595
kWh
$6,132
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,062 $6,270 $4,547
119,918
kWh
$1,515
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,624 $418 $4,368
89,845
kWh
$1,256
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,820 $10,945 $2,640
87,464
kWh
$1,180
06 2.7261: Install timers and/or thermostats $3,205 $708 $2,182
71,923
kWh
$1,023
07 3.6124: Burn waste oil for heat $1,181 $4,586 $1,051
34,409
kWh
$130
TOTAL RECOMMENDED $74,708 $71,198 $50,128
1,790,446
kWh
$24,580
TOTAL IMPLEMENTED $64,260 $59,634 $42,348
1,564,196
kWh
$21,912
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs