ITAC Assessment: UD0517
ITAC logo
ITAC Assessment: UD0517
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Specialty Steel Products
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $1
M
to 5
M
# of Employees 24
Plant Area 18,000
ft2
Annual Production 0
pieces
Production Hrs. Annual 2,750
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $14,222 128,370
kWh
Electricity Demand $339 28
kW-mo/yr
Electricity Fees $59 -
Natural Gas $10,135 1,990
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,418 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,805

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.7231: Use radiant heater for spot heating $8,408 $6,000 - - $4,408
-
MMBtu
$4,000
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,347 $4,436 $532
16,706
kWh
$877
-
kW-mo/yr
- $(-62.0)
03 2.7142: Utilize higher efficiency lamps and/or ballasts $266 $300 $95
2,931
kWh
$157
-
kW-mo/yr
- $14
04 2.6212: Turn off equipment during breaks, reduce operating time $246 - $246
7,620
kWh
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $151 $20 $57
1,758
kWh
$94
-
kW-mo/yr
- -
TOTAL RECOMMENDED $10,418 $10,756 $930
29,015
kWh
$1,128
-
kW-mo/yr
$4,408
-
MMBtu
$3,952
TOTAL IMPLEMENTED $8,805 $6,020 $303
9,378
kWh
$94
-
kW-mo/yr
$4,408
-
MMBtu
$4,000
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs