ITAC Assessment: IC0123
ITAC logo
ITAC Assessment: IC0123
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product steel rounds, squares, billets, and slabs
NAICS 331110: Iron and Steel Mills and Ferroalloy Manufacturing
SIC 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills
Sales Range $100
M
to 500
M
# of Employees 245
Plant Area 479,100
ft2
Annual Production 360,000
ton
Production Hrs. Annual 5,096
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,874,752 136,529,058
kWh
Electricity Demand $2,320,959 514,613
kW-mo/yr
Natural Gas $3,894,358 479,534
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,181,466 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,717,547

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Water Consumption Savings By-product Production Savings
01 2.2437: Recover waste heat from equipment $2,641,138 $12,550,416 - - $(-5,650,546.0)
-
MMBtu
$(-240,000.0) $(-425,524.0)
-
Tgal
$8,957,208
02 2.1133: Adjust burners for efficient operation $76,409 $252,000 - - $76,409
-
MMBtu
- - -
03 2.4322: Use or replace with energy efficient substitutes $1,509,727 $6,804,600 - - $1,509,727
-
MMBtu
- - -
04 2.2414: Use waste heat from hot flue gases to preheat $861,835 $1,928,400 $(-3,879.0)
(-277,061)
kWh
$(-3,004.0)
-
kW-mo/yr
$868,718
-
MMBtu
- - -
05 3.4113: Treat and reuse rinse waters $92,357 $31,583 $(-4,849.0)
(-346,327)
kWh
$(-3,782.0)
-
kW-mo/yr
- - $100,988
-
Tgal
-
TOTAL RECOMMENDED $5,181,466 $21,566,999 $(-8,728.0)
(-623,388)
kWh
$(-6,786.0)
-
kW-mo/yr
$(-3,195,692.0)
-
MMBtu
$(-240,000.0) $(-324,536.0)
-
Tgal
$8,957,208
TOTAL IMPLEMENTED $2,717,547 $12,802,416 - - $(-5,574,137.0)
-
MMBtu
$(-240,000.0) $(-425,524.0)
-
Tgal
$8,957,208
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs