ITAC Assessment: AS0495
ITAC logo
ITAC Assessment: AS0495
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Treated Wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 7
Plant Area 7,700
ft2
Annual Production 273,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,547 1,013,760
kWh
Electricity Demand $20,471 1,929
kW-mo/yr
Electricity Fees $8,543 -
TOTAL YEARLY COSTS $98,561
RECOMMENDED SAVINGS* $40,531 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,134

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.4323: Use optimum size and capacity equipment $23,643 $3,941 $20,280
289,720
kWh
$3,363
-
kW-mo/yr
-
02 2.9114: Use solar heat to make electricty $14,397 $249,210 $13,666
226,980
kWh
$731
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,621 $908 $1,253
17,897
kWh
$263
-
kW-mo/yr
$105
04 2.7135: Install occupancy sensors $732 $612 $732
10,464
kWh
- -
05 2.7272: Install heat pipes / raise cooling setpoint $138 $33 $95
1,356
kWh
$43
-
kW-mo/yr
-
TOTAL RECOMMENDED $40,531 $254,704 $36,026
546,417
kWh
$4,400
-
kW-mo/yr
$105
TOTAL IMPLEMENTED $26,134 $5,494 $22,360
319,437
kWh
$3,669
-
kW-mo/yr
$105
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs