ITAC Assessment: MS0446
ITAC logo
ITAC Assessment: MS0446
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Metal Stamping
NAICS 336211: Motor Vehicle Body Manufacturing
SIC 3711: Motor Vehicles and Passenger Car Bodies
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 50,000
ft2
Annual Production 24,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $241,277 3,104,214
kWh
Electricity Demand $93,457 7,878
kW-mo/yr
Electricity Fees $4,001 -
LPG $31,140 915
MMBtu
TOTAL YEARLY COSTS $369,875
RECOMMENDED SAVINGS* $113,002 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings
01 2.9114: Use solar heat to make electricty $66,685 $716,889 $50,612
657,292
kWh
$16,073
-
kW-mo/yr
-
02 2.1321: Replace fossil fuel equipment with electrical equipment $25,744 $100,000 $(-5,396.0)
(-70,080)
kWh
- $31,140
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,646 $4,652 $2,577
34,690
kWh
$69
-
kW-mo/yr
-
04 2.7232: Replace existing hvac unit with high efficiency model $17,927 $24,500 $17,927
232,816
kWh
- -
TOTAL RECOMMENDED $113,002 $846,041 $65,719
854,718
kWh
$16,142
-
kW-mo/yr
$31,140
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs