ITAC Assessment: IC0273
ITAC logo
ITAC Assessment: IC0273
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Automotive Interiors
NAICS 336360: Motor Vehicle Seating and Interior Trim Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 164
Plant Area 346,000
ft2
Annual Production 50,000
units
Production Hrs. Annual 2,250
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $377,488 3,913,319
kWh
Electricity Demand $132,628 18,419
kW-mo/yr
Electricity Fees $46,916 -
Natural Gas $308,227 48,749
MMBtu
Waste Disposal Costs
Water Usage $4,676 110,700
Tgal
TOTAL YEARLY COSTS $869,935
RECOMMENDED SAVINGS* $285,413 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,366 $2,851 $2,431
25,326
kWh
$935
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,794 $4,100 $1,245
12,967
kWh
$549
-
kW-mo/yr
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $879 $841 $635
6,609
kWh
$244
-
kW-mo/yr
04 2.7221: Lower temperature during the winter season and vice-versa $200 $35 $182
1,892
kWh
$19
-
kW-mo/yr
05 2.9114: Use solar heat to make electricty $279,174 $2,543,426 $269,214
2,804,314
kWh
$9,960
-
kW-mo/yr
TOTAL RECOMMENDED $285,413 $2,551,253 $273,706
2,851,109
kWh
$11,707
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs