Assessment Year | 2024 |
---|---|
Principal Product | Refuse Trucks |
NAICS | 336211: Motor Vehicle Body Manufacturing |
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 210 |
Plant Area |
250,000
ft2
|
Annual Production | 310
units
|
Production Hrs. Annual | 2,125
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $98,222 | 1,251,240 |
kWh
|
$0.079 | |
Electricity Demand | $54,143 | 6,016 |
kW-mo/yr
|
$9.00 | |
Electricity Fees | $14,482 | - |
|
- | |
Natural Gas | $16,659 | 1,047 |
MMBtu
|
$15.92 | |
LPG | $15,972 | 534 |
MMBtu
|
$29.89 | |
Waste Disposal Costs | |||||
Water Usage | $2,159 | 461 |
Tgal
|
$4.68 | |
Water Disposal | $2,159 | 940 |
Tgal
|
$2.30 | |
TOTAL YEARLY COSTS | $203,796 | ||||
RECOMMENDED SAVINGS* | $76,809 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings |
---|---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $750 | $393 |
$619
7,881
kWh
|
$131
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $647 | $1,821 |
$613
7,854
kWh
|
$33
-
kW-mo/yr
|
- | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,497 | - |
$5,497
72,833
kWh
|
- | - | |
04 | 2.9114: Use solar heat to make electricty | $48,250 | $482,125 |
$48,250
643,337
kWh
|
- | - | |
05 | 2.3212: Optimize plant power factor | $8,443 | $4,229 | - |
$8,443
-
kW-mo/yr
|
- | |
06 | 2.1321: Replace fossil fuel equipment with electrical equipment | $13,222 | $50,000 |
$(-2,750.6)
(-35,040)
kWh
|
- |
$15,972
-
MMBtu
|
|
TOTAL RECOMMENDED | $76,809 | $538,568 |
$52,229
696,865
kWh
|
$8,607
-
kW-mo/yr
|
$15,972
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs