ITAC Assessment: BD0043
ITAC logo
ITAC Assessment: BD0043
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product House siding and mobile home skirts
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 400
Plant Area 247,750
ft2
Annual Production 100,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $888,277 21,033,705
kWh
Natural Gas $70,212 19,207
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,282 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,665 $1,500 $3,665
86,753
kWh
02 2.4221: Install compressor air intakes in coolest locations $4,250 $1,500 $4,250
100,528
kWh
03 2.4133: Use most efficient type of electric motors $26,075 $60,530 $26,075
617,233
kWh
04 2.7135: Install occupancy sensors $1,283 $600 $1,283
30,481
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $6,009 $7,635 $6,009
142,145
kWh
TOTAL RECOMMENDED $41,282 $71,765 $41,282
977,140
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs