Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

641

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Motor vehicle body and trailer manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MS0446 #04 Y:2025 Replace existing hvac unit with high efficiency model $17,927 $24,500
MS0446 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $2,646 $4,652
MS0446 #02 Y:2025 Replace fossil fuel equipment with electrical equipment $25,744 $100,000
MS0446 #01 Y:2025 Use solar heat to make electricty $66,685 $716,889
MS0441 #03 Y:2024 Apply for tax-free status for energy purchases $1,281 -
MS0441 #02 Y:2024 Replace fossil fuel equipment with electrical equipment $47,319 $175,000
MS0441 #01 Y:2024 Use solar heat to make electricty $60,735 $506,485
MS0433 #06 Y:2024 Replace fossil fuel equipment with electrical equipment $13,222 $50,000
MS0433 #05 Y:2024 Optimize plant power factor $8,443 $4,229
MS0433 #04 Y:2024 Use solar heat to make electricty $48,250 $482,125
MS0433 #03 Y:2024 Reduce the pressure of compressed air to the minimum required $5,497 -
MS0433 #02 Y:2024 Utilize higher efficiency lamps and/or ballasts $647 $1,821
MS0433 #01 Y:2024 Install occupancy sensors $750 $393
UU0248 #07 Y:2024 Use or replace with energy efficient substitutes $1,570 $9,360
UU0248 #06 Y:2024 Use or replace with energy efficient substitutes $940 $3,000
UU0248 #05 Y:2024 Replace fossil fuel equipment with electrical equipment $6,380 $133,800
UU0248 #04 Y:2024 Add equipment/ operators to reduce production bottleneck $33,420 $319,250
UU0248 #03 Y:2024 Use automatic flow control $820 $4,250
UU0248 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,740 $1,270
UU0248 #01 Y:2024 Install compressor air intakes in coolest locations $980 $2,600