matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
MS0433 #06 Y:2024 | 06 | 2024 | Replace fossil fuel equipment with electrical equipment | $13,222 | $50,000 |
n/a
|
MS0433 #05 Y:2024 | 05 | 2024 | Optimize plant power factor | $8,443 | $4,229 |
n/a
|
MS0433 #04 Y:2024 | 04 | 2024 | Use solar heat to make electricty | $48,250 | $482,125 |
n/a
|
MS0433 #03 Y:2024 | 03 | 2024 | Reduce the pressure of compressed air to the minimum required | $5,497 | - |
n/a
|
MS0433 #02 Y:2024 | 02 | 2024 | Utilize higher efficiency lamps and/or ballasts | $647 | $1,821 |
n/a
|
MS0433 #01 Y:2024 | 01 | 2024 | Install occupancy sensors | $750 | $393 |
n/a
|
UU0248 #07 Y:2024 | 07 | 2024 | Use or replace with energy efficient substitutes | $1,570 | $9,360 |
n/a
|
UU0248 #06 Y:2024 | 06 | 2024 | Use or replace with energy efficient substitutes | $940 | $3,000 |
n/a
|
UU0248 #05 Y:2024 | 05 | 2024 | Replace fossil fuel equipment with electrical equipment | $6,380 | $133,800 |
n/a
|
UU0248 #04 Y:2024 | 04 | 2024 | Add equipment/ operators to reduce production bottleneck | $33,420 | $319,250 |
n/a
|
UU0248 #03 Y:2024 | 03 | 2024 | Use automatic flow control | $820 | $4,250 |
n/a
|
UU0248 #02 Y:2024 | 02 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,740 | $1,270 |
n/a
|
UU0248 #01 Y:2024 | 01 | 2024 | Install compressor air intakes in coolest locations | $980 | $2,600 |
n/a
|
MZ0356 #09 Y:2023 | 09 | 2023 | Replace treated water with well / surface water | $10,677 | $100,000 | |
MZ0356 #08 Y:2023 | 08 | 2023 | Meter recycled water (to reduce sewer charges) | $7,202 | $7,540 | |
MZ0356 #07 Y:2023 | 07 | 2023 | Clean or color roof to reduce solar load | $135,000 | $306,035 | |
MZ0356 #06 Y:2023 | 06 | 2023 | Use solar heat to make electricty | $525,252 | $3,450,533 | |
MZ0356 #05 Y:2023 | 05 | 2023 | Lower temperature during the winter season and vice-versa | $6,120 | $2,680 | |
MZ0356 #04 Y:2023 | 04 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $11,117 | $14,802 | |