380
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Metal heat treating | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| SJ0024 #03 Y:2024 | 03 | 2024 | Reduce the pressure of compressed air to the minimum required | $490 | - | |
| SJ0024 #02 Y:2024 | 02 | 2024 | Use battery storage for demand control | $3,606 | $5,559 | |
| SJ0024 #01 Y:2024 | 01 | 2024 | Use solar heat to make electricty | $45,462 | $42,170 | |
| AM0914 #04 Y:2024 | 04 | 2024 | Utilize energy-efficient belts and other improved mechanisms | $1,310 | - | |
| AM0914 #03 Y:2024 | 03 | 2024 | Reduce the pressure of compressed air to the minimum required | $1,515 | - | |
| AM0914 #02 Y:2024 | 02 | 2024 | Utilize higher efficiency lamps and/or ballasts | $2,190 | $2,260 | |
| AM0914 #01 Y:2024 | 01 | 2024 | Optimize plant power factor | $40,720 | $77,840 | |
| UW2316 #03 Y:2023 | 03 | 2023 | Use solar heat to make electricty | $37,897 | $192,325 | |
| UW2316 #02 Y:2023 | 02 | 2023 | Use / purchase optimum sized compressor | $73,471 | $88,000 | |
| UW2316 #01 Y:2023 | 01 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $705 | $2,080 | |
| OR0776 #03 Y:2023 | 03 | 2023 | Upgrade controls on compressors | $41,797 | $5,903 | |
| OR0776 #02 Y:2023 | 02 | 2023 | Replace fossil fuel equipment with electrical equipment | $3,031 | $18,336 | |
| OR0776 #01 Y:2023 | 01 | 2023 | Optimize plant power factor | $1,131 | $6,802 | |
| SD0635 #09 Y:2023 | 09 | 2023 | Replace existing chiller with high efficiency model | $1,894 | $3,900 | |
| SD0635 #08 Y:2023 | 08 | 2023 | Repair and eliminate steam leaks | $5,330 | $3,125 | |
| SD0635 #07 Y:2023 | 07 | 2023 | Utilize higher efficiency lamps and/or ballasts | $541 | $1,832 | |
| SD0635 #06 Y:2023 | 06 | 2023 | Adjust burners for efficient operation | $10,368 | - | |
| SD0635 #05 Y:2023 | 05 | 2023 | Replace electrically-operated equipment with fossil fuel equipment | $10,668 | $37,853 | |
| SD0635 #04 Y:2023 | 04 | 2023 | Use waste heat from hot flue gases to preheat | $22,128 | $51,000 | |
| SD0635 #03 Y:2023 | 03 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,458 | $1,000 |