ITAC Assessment: OR0776
ITAC logo
ITAC Assessment: OR0776
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product custom steel plates
NAICS 332811: Metal Heat Treating
SIC 3398: Metal Heat Treating
Sales Range $100
M
to 500
M
# of Employees 30
Plant Area 194,278
ft2
Annual Production 74,880
ton
Production Hrs. Annual 7,488
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $539,861 4,493,803
kWh
Electricity Demand $36,109 9,228
kW-mo/yr
Electricity Fees $50,757 -
Natural Gas $1,017,542 1,165,570
MMBtu
Waste Disposal Costs
Water Usage $41,264 4,843
Tgal
Water Disposal $95,158 4,843
Tgal
TOTAL YEARLY COSTS $1,780,691
RECOMMENDED SAVINGS* $45,959 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,131

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Gas Savings
01 2.3212: Optimize plant power factor $1,131 $6,802 - - $1,131 -
02 2.1321: Replace fossil fuel equipment with electrical equipment $3,031 $18,336 - - - $3,031
-
MMBtu
03 2.4224: Upgrade controls on compressors $41,797 $5,903 $41,379
344,448
kWh
$418
-
kW-mo/yr
- -
TOTAL RECOMMENDED $45,959 $31,041 $41,379
344,448
kWh
$418
-
kW-mo/yr
$1,131 $3,031
-
MMBtu
TOTAL IMPLEMENTED $1,131 $6,802 - - $1,131 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs