Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Heat Treated Metal
NAICS 332811: Metal Heat Treating
SIC 3398: Metal Heat Treating
Sales Range $1
M
to 5
M
# of Employees 16
Plant Area 58,000
ft2
Annual Production 30,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $240,887 2,765,633
kWh
Electricity Demand $80,474 10,965
kW-mo/yr
Electricity Fees $13,679 -
Natural Gas $104,566 10,649
MMBtu
TOTAL YEARLY COSTS $439,606
RECOMMENDED SAVINGS* $112,073 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $74,176

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $705 $2,080 $632
7,256
kWh
$73
-
kW-mo/yr
02 2.4226: Use / purchase optimum sized compressor $73,471 $88,000 $65,907
756,678
kWh
$7,565
-
kW-mo/yr
03 2.9114: Use solar heat to make electricty $37,897 $192,325 $33,980
390,123
kWh
$3,917
-
kW-mo/yr
TOTAL RECOMMENDED $112,073 $282,405 $100,518
1,154,057
kWh
$11,555
-
kW-mo/yr
TOTAL IMPLEMENTED $74,176 $90,080 $66,539
763,934
kWh
$7,637
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs