ITAC Assessment: UU0126
ITAC logo
ITAC Assessment: UU0126
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product potato chips, corn chips
NAICS 311919: Other Snack Food Manufacturing
SIC 2096: Potato Chips, Corn Chips, and Similar Snacks
Sales Range $100
M
to 500
M
# of Employees 150
Plant Area 262,500
ft2
Annual Production 240,000,000
units
Production Hrs. Annual 8,712
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $347,181 9,266,641
kWh
Electricity Demand $11,459 911
kW-mo/yr
Natural Gas $111,838 33,585
MMBtu
Waste Disposal Costs
Water Usage $217,419 87,669
Tgal
Water Disposal $10,444 86,876
Tgal
Solid Waste (non-haz) $285,313 2,296,500
lb
TOTAL YEARLY COSTS $983,654
RECOMMENDED SAVINGS* $293,718 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,619

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Solid Waste (non-haz) Savings
01 3.4131: Minimize contamination of water before treatment $207,807 $2,000,000 $(-34,369.0)
(-954,720)
kWh
$(-27,324.0)
-
kW-mo/yr
- - - - $269,500
-
lb
02 3.4111: Use closed cycle process to minimize waste water production $27,838 $3,980 - - - - $26,499
-
Tgal
$1,339
-
Tgal
-
03 2.1224: Replace boiler $26,315 $176,427 - - - $26,315
-
MMBtu
- - -
04 2.2414: Use waste heat from hot flue gases to preheat $14,977 $8,120 - - - $14,977
-
MMBtu
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $10,358 $90 $5,787
156,394
kWh
$3,472
-
kW-mo/yr
$1,099 - - - -
06 2.1233: Analyze flue gas for proper air/fuel ratio $6,423 $2,000 - - - $6,423
-
MMBtu
- - -
TOTAL RECOMMENDED $293,718 $2,190,617 $(-28,582.0)
(-798,326)
kWh
$(-23,852.0)
-
kW-mo/yr
$1,099 $47,715
-
MMBtu
$26,499
-
Tgal
$1,339
-
Tgal
$269,500
-
lb
TOTAL IMPLEMENTED $44,619 $6,070 $5,787
156,394
kWh
$3,472
-
kW-mo/yr
$1,099 $6,423
-
MMBtu
$26,499
-
Tgal
$1,339
-
Tgal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs