ITAC Assessment: SJ0024
ITAC logo
ITAC Assessment: SJ0024
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Manufacturing Aerospace, Defense, Semiconductor
NAICS 332811: Metal Heat Treating
SIC 3398: Metal Heat Treating
Sales Range $10
M
to 50
M
# of Employees 31
Plant Area 19,000
ft2
Annual Production 30,000
units
Production Hrs. Annual 2,600
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $78,995 387,184
kWh
Electricity Demand $23,543 1,282
kW-mo/yr
Natural Gas $17,562 640
MMBtu
TOTAL YEARLY COSTS $120,100
RECOMMENDED SAVINGS* $60,280 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.9114: Use solar heat to make electricty $45,462 $42,170 $43,180
211,668
kWh
$2,282
-
kW-mo/yr
02 2.3141: Use battery storage for demand control $3,606 $5,559 $1,570
7,695
kWh
$2,036
-
kW-mo/yr
03 2.4231: Reduce the pressure of compressed air to the minimum required $490 - $490
2,404
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,182 - $8,182
40,107
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,292 $8,243 $1,029
5,042
kWh
$263
-
kW-mo/yr
06 2.6218: Turn off equipment when not in use $1,248 - $1,248
6,118
kWh
-
TOTAL RECOMMENDED $60,280 $55,972 $55,699
273,034
kWh
$4,581
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs