1,980
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UA0009 #01 Y:2007 | 01 | 2007 | Utilize higher efficiency lamps and/or ballasts | $4,681 | $16,061 | |
| MA0621 #05 Y:2007 | 05 | 2007 | Install / repair insulation on condensate lines | $405 | $280 | |
| MA0621 #04 Y:2007 | 04 | 2007 | Use adjustable frequency drive or multiple speed motors on existing system | $646 | $2,000 | |
| MA0621 #03 Y:2007 | 03 | 2007 | Reduce space conditioning during non-working hours | $3,253 | $10,000 | |
| MA0621 #02 Y:2007 | 02 | 2007 | Use adjustable frequency drive or multiple speed motors on existing system | $32,424 | $29,000 | |
| MA0621 #01 Y:2007 | 01 | 2007 | Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $61,876 | $354,790 | |
| OK0748 #07 Y:2007 | 07 | 2007 | Install / repair insulation on steam lines | $8,337 | $8,477 | |
| OK0748 #06 Y:2007 | 06 | 2007 | Install timers and/or thermostats | $34,710 | $1,002 | |
| OK0748 #05 Y:2007 | 05 | 2007 | Repair and eliminate steam leaks | $22,467 | $1,029 | |
| OK0748 #04 Y:2007 | 04 | 2007 | Operate boilers on high fire setting | $22,448 | $2,495 | |
| OK0748 #03 Y:2007 | 03 | 2007 | Reduce the pressure of compressed air to the minimum required | $1,835 | $6,840 | |
| OK0748 #02 Y:2007 | 02 | 2007 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,523 | $559 | |
| OK0748 #01 Y:2007 | 01 | 2007 | Recover waste heat from equipment | $8,664 | $3,013 | |
| TT0004 #05 Y:2007 | 05 | 2007 | Repair or replace steam traps | $557 | - | |
| TT0004 #04 Y:2007 | 04 | 2007 | Eliminate leaks in inert gas and compressed air lines/ valves | $402 | - | |
| TT0004 #03 Y:2007 | 03 | 2007 | Analyze flue gas for proper air/fuel ratio | $1,491 | - | |
| TT0004 #02 Y:2007 | 02 | 2007 | Insulate feedwater tank | $654 | $500 | |
| TT0004 #01 Y:2007 | 01 | 2007 | Install / repair insulation on steam lines | $20,486 | $2,500 | |
| LM0123 #04 Y:2006 | 04 | 2006 | Train operators for maximum operating efficiency | $37,630 | $1,000 | |
| LM0123 #03 Y:2006 | 03 | 2006 | Replace existing hvac unit with high efficiency model | $6,789 | $20,000 |