Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,963

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Coating, engraving, heat treating, and allied activities
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TT0004 #01 Y:2007 Install / repair insulation on steam lines $20,486 $2,500
LM0123 #04 Y:2006 Train operators for maximum operating efficiency $37,630 $1,000
LM0123 #03 Y:2006 Replace existing hvac unit with high efficiency model $6,789 $20,000
LM0123 #02 Y:2006 Cover open tanks $7,790 $1,800
LM0123 #01 Y:2006 Utilize higher efficiency lamps and/or ballasts $15,533 $33,000
UM0308 #07 Y:2006 Insulate bare equipment $142 $310
UM0308 #06 Y:2006 Install compressor air intakes in coolest locations $392 $1,000
UM0308 #05 Y:2006 Re-size charging openings or add movable cover or door $536 $300
UM0308 #04 Y:2006 Utilize higher efficiency lamps and/or ballasts $1,462 $3,479
UM0308 #03 Y:2006 Use waste heat from hot flue gases to preheat $2,070 $1,250
UM0308 #02 Y:2006 Reduce ventilation air $2,507 $500
UM0308 #01 Y:2006 Adjust burners for efficient operation $3,769 $500
IC0118 #11 Y:2006 Install occupancy sensors $62 $291
IC0118 #10 Y:2006 Utilize higher efficiency lamps and/or ballasts $235 $1,132
IC0118 #09 Y:2006 Utilize higher efficiency lamps and/or ballasts $428 $516
IC0118 #08 Y:2006 Eliminate leaks in inert gas and compressed air lines/ valves $953 $1,200
IC0118 #07 Y:2006 Install / repair insulation on steam lines $2,403 $2,544
IC0118 #06 Y:2006 Utilize higher efficiency lamps and/or ballasts $3,328 $8,717
IC0118 #05 Y:2006 Use most efficient type of electric motors $4,583 $17,220
IC0118 #04 Y:2006 Analyze flue gas for proper air/fuel ratio $2,612 -